The faults with the paint and plaster were sorted out straight away and we are pleased with the results (it is a pity it needed doing in the first place, but the end result is all good).
Our spa is still faulty. It only works about 70- 80% of the time and we have basically stopped using it. Pretty disappointing as this was one of the main features of the house that we loved when were were deciding what to build. The plumber said the motor would have to be replaced. So who organises and pays for that?
Our powder room still stinks like a sewer about half the time, and not at all the other half. Unfortunately the day the plumber came it didn't smell, so the response I got today was "I believe the plumber has been to your home & done what they could."
I am really worried about the plumbing job throughout the house... there has been problem after problem and there is still water accumulating at the base of the downpipe out the back door. There was an external drain where they had just inserted 90mm pipe into a piece of 100mm pipe and just left it resting there.
Generally everything has been attended to and resolved without delay and I can't fault that... but I feel that these last few issues are going to cause us some grief.